10.2025s6.1.1.(6,7)i4h40-2g35f8c26b168 this is the International code word in the code Letter digital coding marker – BMCK, Final monitoring, Terminal for automated control of Ukraine –TAUG b168, Housing sector, Utilities DHW and thermal power plants, for October 2025 year. Meaning of individual codes, included in the code word see below, goal of the TAUG project watch – Block diagram of the subsystem BC MFP s6.1- Housing – s6.1.1.6-DHW and s6.1.1.7-TPP on site i4h40-2g35f8c26d168a1, detailed explanation in the explanatory note of the final developed project.
Explanations for andflashes about information in cells tables
Cell – a1 – Final monitoring – 10.2025s6.1.1.(6,7)i4h40-2g35f8c26b168 – Where in the BMCC code: Monitoring period: October 2025 year – (10.2025), Housing (s6.1) DHW utility services – (s6.1.1.6), TPP- (s6.1.1.7), at the site, quarter 4 –(i4), house no. 40-b – (h40-2), he is. Klavdievskaya - (g35), Svyatoshinsky district - (f8), Mr. Kyiv - (c26), State of Ukraine – (b168).
Column/Row: Cell – a2 – Correlation coefficient = 4,5O; Cell: b2 – Starting temperature of safe DHW = 55O; Cell: c2 – The maximum set DHW temperature adopted in the former USSR = 75O; Cell: d2 – An unreasonable, far-fetched standard for hot water temperature has been adopted in Ukraine for payment = 40O; Cell: f2 – Minimum established standard for hot water supply adopted in the former USSR = 50O.
Column/Row: Cell: a3 – Housing (s6.1) DHW utility services – (s6.1.1.6); Cell – f3 – Housing (s6.1) Utilities TPP – (s6.1.1.6), P.S.
Column/Row: Cell: a4, b4, c4, d4, e4 – Letter designations of the columns of the table of the Final monitoring Housing (s6.1), DHW utility services – (s6.1.1.6), DHW per month Where: Scolumn/row: Cell – a2 – Correlation coefficient = 4,5O; Cell: b2 – Starting temperature of safe DHW = 55O; Cell: c2 – The maximum set DHW temperature adopted in the former USSR = 75O; Cell: d2 – An unreasonable, far-fetched standard for hot water temperature has been adopted in Ukraine for payment = 40O; Cell: f2 – Minimum established standard for hot water supply adopted in the former USSR = 50O.
If the standard DHW temperature in the row cells 2, cell – b2 - below 55O within a month, or its reduction below the established norm, and also after turning off the hot water supply for a day or more, after turning it on for two days there is less DHW 75O in which the condition for safe DHW consumption is not met, it is not subject to payment at the established rate indicated in the cell a5, due to the danger of natural-industrial contamination with Legionella and other bacteria, as well as in cases of the use of bacterial weapons, created based on the use of Legionella bacteria and other bacteria, infecting the human body on planet Earth. This interpretation is scientific, including. may have other indicators if medically justified, when treating water with Chlorine or similar chemical elements and methods, this norm is subject to official approval, it is a design TAUG NGO PZ.
P.S.
DHW monitoring photo 13.10.2025 (starting from 01.05.2025 monitoring photo was not carried out)

P.S.
